Publications

Back to staff profile

  • C. Burt, Y. Chan. Accurate costing in mixed integer utilisation mining models. 18th World IMACS Congress and MODSIM 2009 - International Congress on Modelling and Simulation: Interfacing Modelling and Simulation with Mathematical and Computational Sciences, Proceedings, 204-210, 2020.

  • C. Ras, C. Burt, A. Costa. Algorithms for the power-p Steiner tree problem in the Euclidean plane. Revista de informatica teorica e aplicada, 25, 28-42, 2018.

  • C. Burt, Y. Chan, L Caccetta. Accurate costing of mining equipment. 150, 145-152, SPRINGER INTERNATIONAL PUBLISHING AG, 2018. doi: 10.1007/978-3-319-76255-5_9.

  • C. Burt, Louis Caccetta, Y. Chan. Utilisation-based equipment selection. 150, 115-143, SPRINGER INTERNATIONAL PUBLISHING AG, 2018. doi: 10.1007/978-3-319-76255-5_8.

  • C. Burt, Louis Caccetta, Leon Fouche, Palitha Welgama, L Fouché. An MILP Approach to Multi-Location, Multi-Period Equipment Selection for Surface Mining with Case Studies. Journal of Industrial and Management Optimization, 12, 403-430, 2016. doi: 10.3934/jimo.2016.12.403.

  • M Blom, C. Burt, N Lipovetzky, A Pearce, P Stuckey. Scheduling Tools for Open-Pit Mining Operations. 2015.

  • C. Burt, Nir Lipovetzky, Adrian R Pearce, Peter J Stuckey. Scheduling with Fixed Maintenance, Shared Resources and Nonlinear Feedrate Constraints: A Mine Planning Case Study. Integration of AI and OR Techniques in Constraint Programming, 9075, 91-107, 2015. doi: 10.1007/978-3-319-18008-3_7.

  • C. Burt, N Lipovetzky, AR Pearce, PJ Stuckey. Approximate uni-directional benders decomposition. AAAI Workshop - Technical Report, WS-15-12, 24-31, 2015.

  • N Lipovetzky, C. Burt, A Pearce, PJ Stuckey. Planning for Mining Operations with Time and Resource Constraints. Proceedings of the Twenty-Fourth International Conference on Automated Planning and Scheduling, 2014-January, 404-412, 2014.

  • C. Burt, L Caccetta. Equipment Selection for Surface Mining: A Review. Interfaces, 44, 143-162, 2014. doi: 10.1287/inte.2013.0732.

  • ML Blom, C. Burt, A Pearce, PJ Stuckey. A Decomposition-Based Heuristic for Collaborative Scheduling in a Network of Open-Pit Mines. INFORMS Journal on Computing, 26, 658-689, 2014. doi: 10.1287/ijoc.2013.0590.

  • C. Burt, J Puchinger. Models and Algorithms for Intermodal Transportation and Equipment Selection. Operations Research Proceedings 2011, 305-310, 2011. doi: 10.1007/978-3-642-29210-1_49.

  • C. Burt, L Caccetta, P Welgama, L Fouche, L Fouché. Equipment selection with heterogeneous fleets for multiple period schedules. Journal of the Operational Research Society, 62, 1498-1509, 2011. doi: 10.1057/jors.2010.107.

  • C. Burt, Y. Chan, N. Sonenberg. Exact models for the k-connected minimum energy problem. 28, 392-406, Springer, 2010. doi: 10.1007/978-3-642-11723-7_26.

  • C. Burt, Y. Chan. Accurate costing in mixed integer utilisation mining models. 18th IMACS World Congress - MODSIM09 International Congress on Modelling and Simulation, 204-210, 2009.

  • C. Burt, L Caccetta. Match factor for heterogeneous truck and loader fleets. International Journal of Mining, Reclamation and Environment, 21, 262-270, 2007. doi: 10.1080/17480930701388606.

  • C. Burt, L Caccetta, S Hill, P Welgama. Models for Mining Equipment Selection. Zerger, A. and Argent, R.M. (eds) MODSIM 2005 International Congress on Modelling and Simulation. Modelling and Simulation Society of Australia and New Zealand, December 2005, 170-176, 2005.